In short

Industrial shed design, from a structural engineering perspective, involves designing the portal frame or steel structure, footings, floor slab and bracing to carry the shed's loads, then issuing structural drawings and certification for the building permit. This scope sits alongside the architectural and shed manufacturer's role, not in place of it.

Industrial shed design covers a lot of ground, from the layout and cladding to ventilation and services. This page focuses on the part a structural engineer is responsible for: making sure the shed's frame, footings, slab and bracing safely carry the loads the building will experience, and that the design is properly documented for a building permit.

The structural engineering scope in industrial shed design

A structural engineer's role in shed design sits separately from the shed manufacturer or builder's role. The manufacturer typically supplies the shed system, cladding and standard structural components, while the structural engineer verifies or designs the structure specifically for the site conditions, the client's operational loads, and any features beyond a standard configuration, such as mezzanines, crane runways or heavy racking.

Key Point: Even where a shed is supplied as a pre-engineered system, site-specific structural design is still required for the footings, slab and any non-standard loads, since a generic shed design cannot account for local soil conditions or a particular client's equipment.

Portal frames and structural steel systems

Most industrial sheds use a steel portal frame system, which provides a clear-span structure without internal columns interrupting the floor space. The structural engineer sizes the frame members, column spacing and roof pitch to suit the required clear span and the loads the shed will carry, and designs the connections between frame elements. Where the shed needs internal columns, a mezzanine or a crane runway, these are integrated into the frame design rather than treated as a later addition.

Footings, slabs and bracing

Element Structural engineer's role
Footings Sized against soil bearing capacity and frame reactions from geotechnical data
Floor slab Designed for racking, forklift and storage loads specific to the operation
Bracing Designed to resist wind and other lateral loads across the roof and walls
Connections Designed to transfer loads safely between frame members and to the footings

Bracing is a significant part of shed design because the large roof and wall areas of a typical industrial shed create substantial wind loads, particularly in exposed locations. Read more on the related scope in retaining wall engineering where a shed sits on a sloping site and needs site retention as part of the works.

Loads an industrial shed is designed for

  • Dead loads from the roof, wall cladding and frame self-weight
  • Live loads from maintenance access and any suspended services
  • Wind loads across the roof and wall areas, which govern bracing and connection design in many sheds
  • Operational loads from racking, forklifts, cranes or stored goods
  • Any future load allowance the client wants designed in for later expansion

The design and documentation process

1

Brief and site information

Operational requirements, clear span, and any special loads are confirmed with the client.

2

Geotechnical and site assessment

Soil conditions are established to inform footing and slab design.

3

Structural design

Frame, footings, slab and bracing are designed and modelled against the assessed loads.

4

Permit documentation

Structural drawings and certification are issued to the building surveyor as part of the permit application.

Timeframes depend on the shed's complexity. A standard clear-span shed on good ground can be documented relatively quickly, while a shed with a mezzanine, crane runway or challenging soil conditions takes longer due to the additional design and geotechnical work involved.

Frequently asked questions

What is involved in industrial shed design?
From a structural engineering perspective, industrial shed design involves designing the portal frame, footings, floor slab and bracing to carry the shed's loads, then documenting the design for the building permit.

What does an industrial structural engineer do?
An industrial structural engineer designs and assesses the structure of industrial buildings, including frames, slabs, footings, hardstands and mezzanines, so the building safely carries its operational loads.

How are industrial building slabs and hardstands designed?
Slabs and hardstands are designed for the specific loads they will carry, including point loads from racking and rolling loads from vehicles, against the subgrade conditions confirmed by a geotechnical assessment.

Do I need a structural engineer for a factory?
Yes, for a new factory or shed build and for most alterations that change loads on the structure, including racking installations, mezzanines and change of use.

How long does industrial structural design take?
Programme depends on the shed's complexity. A standard clear-span shed can be documented relatively quickly, while a shed with a mezzanine or challenging site conditions takes longer.

To discuss the structural scope for your next shed project, get in touch with Principal Built Engineering.

Recent Blog Posts

full-experienced-consultancy

Experienced engineering professional that enables creative architecture.

engineering-design

Custom and collaborative engineering designs tailored to client needs.

accurate-compliant

Detailed and practical drawings to support constructability.

expertise

Melbourne-based for responsiveness and flexibility.